What changes with another setup?
Save completed alternatives, then select up to three other scenarios in Analysis → Compare. Export to refresh the comparison. The simulator’s Scenarios tab also offers paired battery-size experiments.
Learn the controls. Follow the workflows. Understand what your results mean.
Set up, replay and save a simulation.
Follow the basics PAID PACKSModel detailed loads, compare options and export a decision report.
Explore the advanced workflowActual application screenshots · fictional example inputs · select a numbered marker for its explanation.
The guide is open to everyone. Sign in or create a free account when you’re ready to save a project.
Start with a property, choose the conditions, then watch how energy moves through the system.
Simulation setup holds the site type, location and operating choices. Changing site type loads new starter equipment and loads.
Run applies changed inputs. Save scenario keeps your work. Explore My Analysis opens the paid analysis workflow after a completed run is saved.
Click the Solar array, Battery, Grid connection or Site loads tile to edit that part of the setup. In analysis mode, these tiles explain the recorded interval.
Solar AC, site served, battery activity and grid import/export describe the same interval. kW is power; kWh is energy over time.
Change equipment from its landscape tile. Set the time of year in the setup panel.
Capacity is stored energy in kWh. Charge and discharge limits are power in kW. A bigger battery does not automatically have a higher output limit.
Initial state of charge starts the run. Reserve and the operating range constrain usable storage; they are not an independent extra battery.
Apply battery settings & run recalculates using the edited configuration. Cancel closes the editor without applying your draft.
Click Solar array for module count and rating, mounting, tilt, azimuth, shading and losses. Use Apply array settings & run to update the recorded results.
Grid Off prevents purchases, exports and grid charging. Export Off stores surplus where possible, then curtails it. Hybrid uses solar and grid supply, with battery support for grid limits and outages.
In Simulation setup, open Weather & operating assumptions near the bottom of the panel.
1 is January; 12 is December. The month and latitude affect modeled solar geometry. Set the scenario first, then your month: a new preset resets the month.
Temperature, cloud intensity and snow loss remain your assumptions. Choosing a month does not download weather or automatically update appliance schedules.
A Saved Project connects your property, scenarios, analysis and exported snapshots.
Choose a property with the same site type as the simulation. The default option reuses a matching property or creates one, subject to your plan.
Names such as “Summer — 10 kWh battery” make comparisons easier. When editing an opened scenario, leave Save as a new scenario unchecked to use its existing slot.
Save setup only keeps inputs without completed results. Run changed inputs first if you want recorded results or Interactive Project Analysis.
After saving, the scenario list refreshes. Reopen from Saved runs or My Projects; you do not need to search through PDF files.
Use sourced equipment examples as a starting point, then match the power and timing to your actual use.
Open Site loads → Add load. Type a name to see autocomplete suggestions relevant to your site; Search all broadens the lookup.
Selecting an example fills a published power value. Rated or maximum input is not necessarily average consumption. Check the linked source and equipment mode.
Set power, duty, start/end time, critical status and solar-surplus-only behavior. The default time window is a placeholder, not a researched usage pattern.
Add to load schedule first, then Apply loads settings & run. If nothing matches, enter a custom load with your own values.
Free uses a basic household profile. Click Site loads to scale it with a demand multiplier: 0.5× halves demand and 2× doubles it. Detailed appliances and EV charging require a paid pack.
Up to 12 individual rows can be modeled. Equal start/end times mean all day. A 24-hour CSV replaces the individual schedule and repeats daily; it does not add to it.
Run and save a completed simulation, then select Explore My Analysis beside Run simulation. It opens in a large modal.
Overview, Energy, Solar, Battery, Grid, Economics and other sections organize your investigation. Navigation adapts to the system and project intent.
Decision Analysis, Professional Installation, DIY / Hybrid or Compare DIY vs. Professional changes planning content without rerunning the original simulation.
Metrics come from the recorded run. Missing costs or annual estimates stay unavailable until the necessary inputs and calculations exist.
Close the modal or use Return to simulation to change equipment and rerun. If analysis edits are unsaved, choose Keep editing or explicitly discard them.
In Overview or Energy, use Play, Pause, Speed and the time scrubber. The landscape and interval values use the same simulation results. Click a landscape tile to inspect that interval.
For a normally grid-connected run, open Assumptions and select Generate an illustrative year and four seasonal replays. Export the Project Decision Report to save and recalculate, then return to Energy to switch seasons.
Investigate trade-offs using your objective and inputs; the application does not choose a universally best system.
Save completed alternatives, then select up to three other scenarios in Analysis → Compare. Export to refresh the comparison. The simulator’s Scenarios tab also offers paired battery-size experiments.
Enter your budget and relevant financial assumptions. Cash-flow previews respond immediately. Payback and longer-term estimates require enough inputs; no break-even is shown explicitly when modeled.
Review modeled battery increments, incremental costs and sensitivity findings. Supply unit costs where needed. Risk uses deterministic sensitivity cases, not probability forecasts. Monte Carlo analysis is not provided.
Use Resilience or the analysis outage controls where available. Check island-capable equipment, initial charge and critical loads. Use a 6–168-hour modeled window in analysis and export to recalculate a changed duration.
Set a professional, DIY or compare intent to reveal implementation content. Review the scope matrix, preliminary equipment categories, DIY/pro assumptions and project roadmap. Export saves planning progress.
Enter a proposal or import/paste text or JSON. Review extracted fields, confirm verification and add the proposal. Use verified total as budget only when intended. Quote capacities do not resize the simulation.
The Interactive Project Analysis is the working experience. The PDF Project Decision Report preserves one particular state of that analysis.
Use the Report section in the analysis navigation. This is separate from the simpler Export PDF action in Run results.
One click saves your current analysis edits, recalculates derived findings and generates the PDF. Wait for the download to finish.
Each export includes its generation time, project, scenario and analysis versions, engine version, report ID and assumptions timestamp.
Your account holds the properties, saved scenarios, access dates, support conversations and security settings.
A Saved Project groups scenarios for a property and preserves its site type.
Simulation takes you back to the equipment and run. Open Interactive Analysis returns to the investigation workspace when access and saved results permit.
Expand Reports for dated exports. These historical files remain separate from the current living analysis.
| Workflow | Free | Either paid pack |
|---|---|---|
| Properties | One active single-family property | All supported site types |
| Saved scenarios | Three eligible basic scenarios | Expanded allowance shown in My account |
| Demand & run window | Basic household profile; up to 24 hours | Detailed schedules, EV loads and runs up to 168 hours |
| Results | Basic results and visible assumptions | Interactive analysis, comparisons, planning and PDF exports |
Both paid packs include the same advanced tools. Project Pack lasts 30 days; Enterprise Pack lasts one calendar year. Review the current price and dates in My account before continuing to PayPal. Packs are one-time purchases with no automatic renewal.
Use My account → Account security to change your password; keep your recovery code safely. Use the support form for account or payment questions. Logout ends your session. Help remains available from the solar lab whether or not you are signed in.
WHEN SOMETHING ISN’T CLEAR
Site-type changes apply new system and load presets. Scenario presets can replace month, weather, schedules, shading, dispatch or export assumptions. Save a separate scenario before experimenting, then check the visible inputs.
It needs a completed, saved simulation and an active paid pack for new calculations. A setup-only save has no results. Run and save it, then choose Explore My Analysis.
The analysis avoids inventing values. A normally grid-connected project needs illustrative annualization and sufficient financial inputs. Review Assumptions and Economics, then export to save and recalculate.
An incomplete quote draft or invalid monthly consumption list blocks export. Verify and add the quote or clear the draft; enter exactly 12 nonnegative monthly totals or leave the list empty. An active pack is required.
Yes, but draft changes are discarded only when you confirm that choice. To keep them, use Report → Export Project Decision Report before closing.
Use the question-mark tooltips, Evidence library and Model assumptions & sources in the simulator. Load suggestions link to their published rating sources. Analysis → Assumptions records the inputs, source status and calculation purpose.
Guide reviewed September 28, 2026. Screens use fictional data and may show the previous site name. The workflows also apply to PreviewSolar; your project values and available sections may differ.